Merged revisions 281575 via svnmerge from
authorRussell Bryant <russell@russellbryant.com>
Tue, 10 Aug 2010 18:05:40 +0000 (18:05 +0000)
committerRussell Bryant <russell@russellbryant.com>
Tue, 10 Aug 2010 18:05:40 +0000 (18:05 +0000)
commit461f9b004e5f21a4e131bcbe20f38e06c042fbe8
tree955f083a704e737f9485e30f572e79d66ddc32bc
parent2a4392008ce56e6e12178b18529515b5471d747c
Merged revisions 281575 via svnmerge from
https://origsvn.digium.com/svn/asterisk/branches/1.8

................
  r281575 | russell | 2010-08-10 13:05:07 -0500 (Tue, 10 Aug 2010) | 16 lines

  Merged revisions 281574 via svnmerge from
  https://origsvn.digium.com/svn/asterisk/branches/1.6.2

  ........
    r281574 | russell | 2010-08-10 13:04:32 -0500 (Tue, 10 Aug 2010) | 9 lines

    Don't move the time threshold for running scheduled events on every iteration.

    Instead, only calculate the time threshold each time ast_sched_runq() is called.

    (closes issue #17742)
    Reported by: schmidts
    Patches:
          sched.c.patch uploaded by schmidts (license 1077)
  ........
................

git-svn-id: https://origsvn.digium.com/svn/asterisk/trunk@281576 65c4cc65-6c06-0410-ace0-fbb531ad65f3
main/sched.c