* A scheduler callback takes a pointer with callback data and
*
* \retval 0 if the callback should not be rescheduled
- * \retval non-zero if the callback should be scheduled agai
+ * \retval non-zero if the callback should be scheduled again
*/
typedef int (*ast_sched_cb)(const void *data);
#define AST_SCHED_CB(a) ((ast_sched_cb)(a))
ast_assert(s != NULL);
#else
{
- char buf[100];
- snprintf(buf, sizeof(buf), "s != NULL, id=%d", id);
- _ast_assert(0, buf, file, line, function);
+ char buf[100];
+
+ snprintf(buf, sizeof(buf), "s != NULL, id=%d", id);
+ _ast_assert(0, buf, file, line, function);
}
#endif
*last_id = id;